Gate House Renovations

 
20180405_112849.jpg
MM.png

Master Management will be renovating all the entrances to Century Village East.  The first phase of the project focused on the east gate off of Military Trail.

 
 

November 15, 2018

IT’S OPEN!

20181108_152533 (1).jpg

THE GATE IS OPEN! ENJOY THE NEW BAR CODE ONLY LANE THAT WILL SAVE RESIDENTS ALL KINDS OF TIME!


Almost Done!

The gate is expected to open in about a week! Here’s a look from a nearby residence.

1.jpg

September 24, 2018 UPDATE

Here are the latest photos of the CVE East Gate.

1 Front of Guardhouse distance shot to include new lanes.jpg

September 15, 2018 UPDATE

The building roof will be completed this week. Building drywall framing complete. All doors and window installed. Road work to include striping existing asphalt and curbs, adding additional lanes and road overlay will begin this week.

 

IMG_2566.jpg
IMG_2567.jpg

August 30, 2018 UPDATE

The building has gone vertical.  Block construction will finish in the next two weeks, and the interior work will begin.

Image.png
Image-1.png

 

July 16, 2018 UPDATE

Here are some recent photos from the East Gate Construction:

IMG_1945.JPG
 

HERE ARE THE PLANS:

Screen Shot 2018-06-01 at 1.37.53 PM.jpg
 

FUTURE PHASES

Master Management will be renovating all the gate house entrances.  All renovations are planned for the summer seasons to minimize disruption.

Phase two of the plan includes the renovation of the West Gate.  Master Management had planned on completing both the East Gate and West Gate during the 2018 summer season.  However, city delays in permitting for the West Gate have prevented the West Gate project from beginning during the summer.  As a result, in order to avoid inconvenience and delays during "season," Master Management has rescheduled the West Gate renovations for summer 2019.

The third phase of the project will include the Hillsboro Gate, currently scheduled for summer 2020.

During all renovations, gates will be closed to the public. Regular traffic (both in and out) will need to use one of the other CVE entrances. However, emergency vehicles will be able to use gates during the construction.